A major international airport operator needed to assess the condition and performance of a 6-in. diameter carbon steel jet fuel pipeline spanning 1.1 miles. The line had only undergone flow testing.
Targeted cleaning, inspection, and Gas Recompression across Tennessee and Georgia including offline caliper runs on 12-in. lines and recompression on two 14-in. pipelines to eliminate atmospheric venting.


